Progress Update: Stadium Enhancements in Full Swing
- Owen-Ames-Kimball Co.
- Jun 30
- 1 min read
Exciting progress continues on the stadium renovation project,
with several key upgrades now complete and more on the horizon.






Construction of the new concession building wrapped up last fall, bringing updated restroom amenities and an improved experience for fans and visitors. This spring, the original concession structure was demolished to make room for a newly designed stadium entrance that will enhance both flow and accessibility.
The track has since been pulverized in place to allow for new paving and surfacing. Around the track perimeter, a trench drain and fence apron were installed to support drainage and durability. Additional work included retaining wall repairs and structural modifications throughout the stadium area.
Footings and foundation work have begun on the new entrance, along with the installation of a new retaining wall along the road. Track paving was completed just last week, marking a major milestone in the process.
Coming up next: framing of the ticket booths, site concrete work for the plaza area, and track surfacing, which is set to begin in two weeks. Final touches like handrails, fencing, and landscaping will follow shortly after. Construction is progressing smoothly, and the transformation is well underway.