top of page
Search

Cafetorium Design

Writer's picture: Owen-Ames-Kimball Co.Owen-Ames-Kimball Co.

We are very excited to share the design of the new Cafetorium (Auditorium/Cafeteria) that will be built at the High School, beginning later this year. The design phase began last summer. In early February, Kingscott took the opportunity to share the cafetoruim design and layout with high school band students through a virtual meeting. Kingscott was able to answer questions and get student feedback on the interior design, while also exposing students to the field of architecture and design. The students were excited about the space, engaged in discussion, and provided their unique perspectives.


The new Cafetorium design was shared to the Board of Education at the end of February. Our team is finalizing design, color schemes, and materials that will be used in the performance area and the cafeteria.


As staff and students view the new facility, they are noticing that it is not a cafeteria with a stage, but rather an auditorium that students will use as a cafeteria. Performance seating will expand to seat 743, while lunchtime seating will accommodate up to 375 students.


A groundbreaking event is being planned for when the weather permits, and we are eager for the building projects to start!


241 views0 comments

Recent Posts

See All

Komentar


kingscott_orange.png

ARCHITECTUrAL PARTNER

Kingscott Associates is our design partner for all construction projects. 

SUBSCRIBE VIA EMAIL

4H3A4517.jpg

CONSTRUCTION

TIMELINE

Construction projects began in 2020 and will span the course of 4 years. 

O-A-K Logo, Website Navy, Square.png

BROUGHT TO YOU BY O-A-K

Owen-Ames-Kimball Co. is our construction management partner for all construction projects.

Thanks for submitting!

© 2020 by Owen-Ames-Kimball Co., Grand Rapids, Michigan

bottom of page